Program is production running on Be
2965 in progress at start of shift
8:08 RICH trip ~10 mins
08:43 CODA problem with start run ~10 mins
09:16 RICH Trip ~5 mins during 2968
09:50 switching to "thin" Be for attempt at high current (140 Micro amps) runninig
10:10 left arm magnet controls go screwy (displays blank. Came back spontaneously but set to zero. Also, came back as "no septum" quads were wrong. (see halog 119961)
Looks like the "thick" Be is 2x thinner than the "thin" Be (going to "thin" doubled the counting rates). Reinserted the "thick" Be (~90 mg/cm^2) (see halog 119966)
11:26 RICH trip
12:15 dropped from 130 micro amps to reduce trip rate
12:38 VDC HV trip during run 2977 (triggered by RICH gas valve operation - Bodo says it always happens)
13:32 Controlled access to adjust settings of beam dump ion chambers
Had to make a second controlled access to reset the diffuser water flow.
14:51 Trying for beam again
MCC trying to go to 140 micro amps
15:25 going back to 120 micro amps
Run Summary
2966 08:10-08:43 Be Production
2967 CODA problems at start, lost
2968 08:51-09:17 Be Production, RICH trip
2969 09:19-09:47 Be Production
2970 10:03-10:05 Start of current ramp up tests
2971 10:35-10:53 Be production ramping up current (Junk!)
2972 10:57-11:25 Be production
2973 11:26 Junk, RICH tripped at start
2974 11:29-11:52 Be Production
2975 11:53-12:16 Be Production
2976 12:16-12:38 Be Production
2977 12:38-12:43 Be Production (VDC HV trip)
2978 12:45-13:07 Be Production
2979 13:07-13:32 Be Production (.82M)
2980 15:07-15:24 Be Production (140 micro amps)
2981 15:26- Be Production (120 micro amps) Deadtime issues see halog 120004