Number Title Requested Recieved Grade PR-08-005 3He(e,e'n) 0 0 B+ PR-08-007 LowQProtonFF 25 14 A- part I & C3 part II PR-08-008 D(e,e'p)Threshold 18 0 C3 PR-08-009 4He(,e,e'p) 20.5 0 C3 PR-08-010 N->Delta 3 3 B+ PR-08-011 DisParity 50 32 A- PR-08-013 HighQGMN 28 0 DR PR-08-014 x>2 12 12 A- PR-08-017 WACS 25 0 D PR-08-019 DeutronB(Q) 41 0 DR PR-08-020 D(e,e'p)HighPm 17.1 0 DR PR-08-025 nDVCS 17 17 B+ PR-08-027 g2p 24 24 A- Total = 280.6 102 101 PAC days were avaliable with 45 days alocation and the 56 days of jeoparrdy experiments. Note: P08-012 4He(e,e'p) polarization is asking for 40 days in Hall C, but they state it could be run in Hall A.