E01-015 Shift Checklist

Date and Time
          
          
          
SHIFT
OWL
DAY
SWING
Your Name
 
 
 
Beam Energy (GeV)
 
 
 
Beam Energy Lock  ON?      
Beam Current (µA)      
Spot X×Y (mm)
 
 
 
BPMB X/Y (< 0.3 mm) 
 
 
 
Fast FB ON?       
TARGET parameters  OK?



CONTROLS ALARM handler ON?



TARGET ALARM handler ON?



Argon Pres.(psi)
  
   
Ethane Pres.(psi)      
CO2 Pres.(psi)      
RIGHT  VDC Gas Flow(T/B)
 
 
 
LEFT VDC Gas Flow(T/B)      
RIGHT VDC HV(T/B)
 
 
 
LEFT VDC HV(T/B)      
RIGHT NMR(OK?)



BigBite Magnet Current(A)



BigBite Magnetic Field (T)



RIGHT Quad #1 (A)
  
  
  
RIGHT Quad #2 (A)      
RIGHT Dipole (A)       
RIGHT Quad #3 (A)      
LEFT NMR(OK?)



LEFT Quad #1 (A)
 
   
LEFT Quad #2 (A)      
LEFT Dipole (A)      
LEFT Quad #3 (A)      
(To be continued)












E01-015 Shift Checklist

(Continued)
RIGHT Cryo Level OK?
(He>60%,N>25%) 
          
          
          
LEFT Cryo Level OK?
(He>60%, N>25%)
     
Right S0 HV  OK?
 
 
 
RIGHT S1 HV OK? 
 
 
 
RIGHT S2 HV OK?      
LEFT S1 HV OK?
 
 
 
LEFT S2 HV OK?      
LEFT PION_REJ HV OK?



LEFT Gas Cerenkov HV OK?



Latest Run Number
 
   
Computer Deadtime
 
   
Prescales 1/2
 
 
 
Prescales 3/4



Prescales 5/6



Prescales 7



Event Rates 1/2  
 
 
Event Rates 3/4


Event Rates 5/6


Event Rates 7


Neutron Detector Scalers halog entry done?
 
 
 
Hall A General Tools halog entry done?
 
 
 
Visual Hall Inspection OK?
 
 
 

 
 
 
 
 
 
 
 

Privacy and Security Notice