GEn Bi-Weekly Detector Meeting April 27, 2005 Attendees: Bogdan Wojtsekhowski, Bodo Reitz, Albert Shahinyan, Brandon Craver, Seamus Riordan, Ameya Kolarkar Begin 2:10 Bodo reviews the status of the N20 analysis. Seamus discusses software progress. A definitions file "mwdc_defs.h" has been created to hold all definitions for wire chamber scripts. Bogdan suggests a rough track reconstruction using only wire numbers n before introducing timing information. Brandon discusses analysis of chamber 1. A rough resolution of ~ 1 mm has been produced without including any timing information. A study of the efficiency at various voltages gives roughly constant efficiencies of 80% - 90%. More work needs to be done to resolve the meaning of this. Bogdan requests manpower for detector assembly. Contact Albert. Ameya discusses his N20 analysis. Bodo provides Albert with a diagram showing the positions of the detectors on the floor in Hall A during GEn. They discuss methods of routing the cables from the detectors to the electronics racks. End: 3:30