PVDIS Run Information
- The experiment is scheduled to run from November 3 to December
23, 2009, including thanksgiving period (although we cannot promise
turkey, snacks will be provided in the counting house on
Thanksgiving night). The changeover
from HAPPEX-III will occur from October 29 to November 2. For
accelerator
schedule, click here.
- PVDIS calendar(last updated 11/18/09. This table provides a summary of kinematics changes, pass changes, and other important stuff)
- PVDIS kinematics. Current kinematics settings are:
- Left arm: 12.9 degrees, -3.66 GeV/c
- Right arm: 20.0 degrees, -2.63 GeV/c
- Raster size: 6x6 MCC units on LD2 cell during production
- Nominal beam position: See whiteboard
- Detectors:
on both arms, all detectors EXCEPT VDC should be turned on during
production. VDCs will be turned on for low current tests such as Q2
measurements.