Fast Counting DAQ
During HAPPEX period (Aug-Oct 09)
(all links here open in new windows)
- Latest scaler maps:
- right HRS, left HRS (maintained by Xiaoyan, most complete, including both scaler channels and variable names)
- right HRS, left HRS (maintained by Xiaochao, including scaler channels)
Installations (July-Aug 09)
(all links here open in new windows)
Test Runs (2008-June 2009)
(all links here open in new windows)
- Test run online analysis instructions: HAPPEX/PAN analysis (PDF, ODT); HRS/Analyzer analysis (PDF, ODT);
- Test run run-sheets: HRS (PDF, ODT); HAPPEX (PDF, ODT);
- Test run TOSP and Target instructions (PDF, ODT);
- For our most recent progress from the May-June 2009 running, see our weekly meeting reports.
- To do/fix list for the January 09 down time, click here.
- 2008 Test Run Progress (last
updated 12/16/2008)
- Xiaoyan's instruction for running the stand-alone (simple)
PVDIS scaler analysis;
- Useful Links
DAQ Design
- The current plan is to install the new DAQ HRS-L during the June/July 2009 down time. The DAQ is already installed in HRS-R:
- Progress on the JLab-made NIM/ECL Level Translator:
- (May 21, 2007) First prototype test results by Chris: PDF;
- (May 14, 2007) Block diagram for the level translator by
Chris: PDF;
- (Mar. 29, 2007) Preliminary cost estimate for the level
translator by Chris: PDF;
- (Mar. 7, 2007) Here is the latest design specification for
the
NIM-ECL level translator: PDF and the
test plan: PDF;
- (Aug 30, 2006) Here is a detailed proposed trigger from Albert
Shayinyan and Bogdan Wojtsekhowski, which are based on the trigger/DAQ schematic of Aug 14 but have full
practical detail. Note, it uses the idea of one column of preshower and
4 columns of shower, and the two HRS are identical. Some custom
electronics would be needed, easily produced at JLab.
- Trigger/DAQ schematic
(Bob's draft 14 Aug 06)
- Earlier DAQ Meeting Minutes
Maintained by:
Xiaochao Zheng
xiaochao@jlab.org
Tel: (757)269-5433
Back to Xiaochao's Homepage