• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT

    User name reitz

    Log entry time 18:40:39 on January 8,2004

    Entry number 115422

    keyword=rich back in

    the RICH detector is back in the left HRS
    (after changing photocathodes and the anode wire plane)
    methane is flowing at 800 sccm since 6.00 pm
    radiator filling started a few minutes later

    DAQ of the RICH, and cables between left and right arm
    are not connected yet
    VDCs need to be lowered (and S1.6 rotated)
    covers from A2 need to be removed

    this will be done tomorrow