Log entry time 17:51:28 on October 10, 2010
Entry number 334249
keyword=Run Plan for Swing 10/10 through Day 10/11
We've been taking elastic calibration data for the last two days with
work on the calorimeter DAQ (which gets priority). It is our hope to be
able to do the calibration of the calorimeter in the middle of this week.
The Moller magnet power could not be powered on for the Moller
measurement today and will need to be looked at.
Plans for the next 24 hours:
- Access for calorimeter DAQ
- Sieve-in calibration data overnight
- Beam should go away at 07:00, open hall to controlled access
(restricted if Ed and company need it)
- Troubleshoot Moller magnet
Plans for the next week:
Possible schedule (not confirmed):
- Compton tuning Monday swing
- HRS polarity flip Tuesday if calorimeter will be ready
- Flip back Thurdsay (Wednesday if everything is done by Wed. day)
- Moller/arc energy Wednesday if there is time, otherwise Friday
A copy of this log entry has been emailed to: hyde, jroche, camsonne, munoz, brads