Main INDEX
Monthly INDEX
PREV
NEXT
Make New Entry,
Make Followup Entry
User name Solvignon
Log entry time 00:05:49 on October13,2010
Entry number 334563
keyword=Shift summary
16:00 Starting the shift during beam study
16:23 Controlled access: Jixie will fill the Moller dewar, Eric and Megan are going to unplug a cable on the compton, Alex is going to HRS hut.
16:55 Everybody is out of the hall. Requested beam permit.
16:57 Several IOCs are down. Asked MCC to check if it is on their end or ours. It was a problem with the EPICS gateway.
17:23 MCC is sending tuned beam.
17:34 MCC is sending cw beam to setup their feedback system.
18:55 Eric and Yves (at MCC) are starting the Compton tune.
19:45 Good tune in the compton. Starting Compton versus beam current test.
21:44 Moving the target to optics to take calibration data at the same time as Compton data.
00:00 Epics gateway crashed
Run summary:
-----------
run# 7229 optics, raster off (the first 1/2 hour at 15uA, then 50uA), 132k events
run# 7230 optics, raster off, 50uA, still running