• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT
    Make New Entry, Make Followup Entry

    User name X. Zheng

    Log entry time 15:54:28 on October15,2010

    Entry number 335016

    keyword=Day shift summary

    8:00-9:00 controlled access to fix the LHRS motion system. Then LHRS was moved to 33.290 degrees;

    9:00-10:00 Calibration run at 33.290 deg and 2.784 GeV/c. Run 7388, 21k events;

    10:00-13:00 Injector work. Controlled access in Hall A for Moller magnet;

    DVCS calorimeter HV was turned ON during this time.

    near 13:00: DVCS calorimeter HV was turned OFF in preparation for beam.

    13:00-15:00 Arc energy measurement.

    15:00- end of shift: Moller measurement.

    --------------------------------
    Production run list:
    --------------------------------
    Run # 7388