8:00-9:00 controlled access to fix the LHRS motion system. Then LHRS was moved to 33.290 degrees;
9:00-10:00 Calibration run at 33.290 deg and 2.784 GeV/c. Run 7388, 21k events;
10:00-13:00 Injector work. Controlled access in Hall A for Moller magnet;
DVCS calorimeter HV was turned ON during this time.
near 13:00: DVCS calorimeter HV was turned OFF in preparation for beam.
13:00-15:00 Arc energy measurement.
15:00- end of shift: Moller measurement.
--------------------------------
Production run list:
--------------------------------
Run # 7388