Main INDEX
Monthly INDEX
PREV
NEXT
Make New Entry,
Make Followup Entry
User name BoZhao
Log entry time 23:56:19 on October15,2010
Entry number 335037
keyword=Swing Shift Summary
16:00 take over the swing shift. The Moller measurement is in progress.
22:45 Moller measurement is done. Call MCC to ask for a controlled access. Sasha and Jixie will work on the Moller magnets in the Hall. Charles also needs to work on the calorimeter in the Hall.
23:15 Call MCC to turn off the raster since it is not needed.