NEXT
Make New Entry,
Make Followup Entry
User name gaskell
Log entry time 17:12:34 on October 17, 2010
Entry number 335369
keyword=Run plan for Sunday swing and Monday owl
Beam has been threaded through the Compton chicane again; likely, it was
left in "straight-through" mode after the Moller measurement. Initial
background rates don't look great, but may improve when Hall C goes back
to higher current.
After Alex completes work with the DVCS calorimeter, we'll continue to
take elastic data through the remainder of swing shift and owl shift. See
the white board for details.
Tomorrow, the beam will be gone at 7 am for work on the end station LCW.
In preparation, the shift crew should stop taking data at 6:30 am and:
1. Ramp down the HRS magnets.
2. Call for Controlled Access.
A copy of this log entry has been emailed to: folts@jlab.org,hyde@jlab.org,camsonne@jlab.org,jroche@jlab.org,munoz@jlab.org