    User name gaskell

    Log entry time 17:12:34 on October 17, 2010

    Entry number 335369

    keyword=Run plan for Sunday swing and Monday owl

    
    Beam has been threaded through the Compton chicane again; likely, it was
    left in "straight-through" mode after the Moller measurement. Initial
    background rates don't look great, but may improve when Hall C goes back
    to higher current.
    
    After Alex completes work with the DVCS calorimeter, we'll continue to
    take elastic data through the remainder of swing shift and owl shift. See
    the white board for details.
    
    Tomorrow, the beam will be gone at 7 am for work on the end station LCW.
    In preparation, the shift crew should stop taking data at 6:30 am and:
    
    1. Ramp down the HRS magnets.
    2. Call for Controlled Access.
    
    