    User name BoZhao

    Log entry time 23:42:18 on October18,2010

    Entry number 335539

    keyword=Swing shift summary

    TO: Nuruzzaman
    3rd: Zafar Ahmed

    16:00 take over the shift. NO beam, Hall is in controlled access. Heidi brought back the Q1 flow and it might need 1 to 2 hours to be stable.

    19:30 Since no one is in the Hall, Alex suggested to go to the beam permit. Dave (RC) said that LCW work was not finished yet, so the water power supply was not on and might need to access the hall again.

    20:50 LCW work is done. Turn on all the magnets of LHRS. Ask for a controlled access to move some stuffs around LHRS so that we can set LHRS at another angle.

    21:05 Dave found that there was a water leak in the hall. Call Jack for help.

    22:40 Dave and Jack finished the work in the hall. The left HRS was set at 33.29 degs and the momentum at 2.748 GeV.

    23:20 Momentum setting is ready, but the dipole NMR signal is not shown in scope. Call MCC to ask for 3uA beam to check beam positions, but MCC is still in recovery progress.