• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT
    Make New Entry, Make Followup Entry

    User name gaskell

    Log entry time 19:19:01 on October 20, 2010

    Entry number 335830

    keyword=Runplan for Wednesday Swing --> Thursday Day

    
    Status: 
    Today we have changed the experiment configuration to DVCS kinematics at
    Q2=2 GeV2, W2=4.4 GeV2 (high energy setting). At 1 uA on the liquid H2
    target, the electron rates are about 70 Hz. Presently, we are running
    with an HRS only trigger (but reading out the calorimeter).
    
    A new firmware has been installed on the ARS - some problems have been
    improved, others not. Dead time issues also need more investigation.
    
    Plans:
    For the remainder of Wednesday Swing shift we will continue to take DVCS
    data at 1 uA.
    
    At the beginning of Thursday Owl shift, we should switch to the target
    boiling study (the detailed plan will be posted on the white board). If
    the boiling study is completed before the end of Owl shift, we will
    revert to DVCS data.
    
    Tasks for Thursday Day: 
    1. Fill Moller (Moller crew)
    2. Check scaler cabling in HRS (Charles)
    3. Dead time investigation
    4. Potential Compton tuning
    
    Access for 1 and 2 will likely be in the morning to try and take
    advantage of the brief beam studies period.
    
    


    A copy of this log entry has been emailed to: hyde@jlab.org,ent@jlab.org,hornt@jlab.org,jixie@jlab.org,camsonne@jlab.org,munoz@jlab.org,jroche@jlab.org