    User name gaskell

    Log entry time 11:28:04 on October 21, 2010

    Entry number 335942

    keyword=Runplan for Thursday Day --> Swing

    
    Status:
    Last night we successfully executed the target boiling test plan (See
    halog 335901) and switched back to "production" mode.
    
    We are presently in Controlled Access for trigger and DAQ work. The
    Moller solenoid has been filled.
    
    Short term plan:
    After the access is complete, we will take some test runs to debug the
    DAQ and trigger configuration. We will then move into a short "delta
    scan" to measure DIS singles in the HRS for overlapping momentum settings
    (see plan on white board). We will move back to production at the end of
    this test.
    
    Compton tunning had been planned for this afternoon, but since we will
    change pass tomorrow (see below) this has been deferred.
    
    Longer term plans:
    1. Friday we will change from 5 pass to 4 pass. The PD has tentatively
    scheduled this for 8:30 am. Hopefully, good rates in the Compton should
    be achieved while tuning up the Hall A line at the end of the pass change.
    
    2. A Moller measurement should be done at some point at 4 pass. There
    will be more information regarding the Hall C target (which impacts the
    Hall C Moller) on Monday. We can decide then if a Spin Dance looks
    feasible in the near future. If not, it may make sense to warm up the Moller.