    User name GOLGE

    Log entry time 00:00:15 on October24,2010

    Entry number 336391

    keyword=shift summary for swing

    Shift Summary
    Swing Shift
    S. Golge SL
    Z. Ahmed TO
    D. Margaziotis 3rd

    Production Running
    E=4.45 GeV
    HRS=31.8


    16:00 In Controlled Access
    17:25 Beam Permit but MCC is not ready to give the beam yet.
    17:40 MCC called, they lost power for WA4 and WA5
    18:35 MCC is not ready so we asked for controlled access to check issues with calorimeter
    19:01 Beam is available but still in controlled access
    19:24 Beam Permit
    19:25 Beam is not ready to be sent yet
    19:55 Harp Scan completed
    20:03 Production started with 2 uA beam on LH2
    Run # 7809 160K events
    23:59 Total production run for swing shift is ~4 hours