User name GOLGE
Log entry time 00:00:15 on October24,2010
Entry number 336391
keyword=shift summary for swing
Shift Summary
Swing Shift
S. Golge SL
Z. Ahmed TO
D. Margaziotis 3rd
Production Running
E=4.45 GeV
HRS=31.8
16:00 In Controlled Access
17:25 Beam Permit but MCC is not ready to give the beam yet.
17:40 MCC called, they lost power for WA4 and WA5
18:35 MCC is not ready so we asked for controlled access to check issues with calorimeter
19:01 Beam is available but still in controlled access
19:24 Beam Permit
19:25 Beam is not ready to be sent yet
19:55 Harp Scan completed
20:03 Production started with 2 uA beam on LH2
Run # 7809 160K events
23:59 Total production run for swing shift is ~4 hours