• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT
    Make New Entry, Make Followup Entry

    User name efuchey

    Log entry time 08:01:34 on October24,2010

    Entry number 336448

    keyword=10/24/10 Owl shift summary

    Shift crew:
    SL: Eric FUCHEY
    TO: Florian ITARD
    3rd: Diancheng WANG

    12:00 am: continue production;
    1:05 am: DAQ config changed, production continued through all the shift, No major incident till 8:00 am.


    Run list:
    7816: LH2 15 cm, 2.5 uA, PS5=1, DVCS production;
    7817: LH2 15 cm, 2.5 uA, PS5=1, DVCS production, short run;
    7818: LH2 15 cm, 2.5 uA, PS5=1, Test;
    7819: LH2 15 cm, 2.5 uA, PS5=1, Test;
    7820: LH2 15 cm, 2.5 uA, PS5=1, Test;
    7821: LH2 15 cm, 2.5 uA, PS5=1, DVCS production;
    7822: LH2 15 cm, 2.5 uA, PS5=1, DVCS production;
    7823: LH2 15 cm, 2.5 uA, PS5=1, DVCS production -> HV trip during this run;
    7824: Junk;
    7825: LH2 15 cm, 2.5 uA, PS5=1, DVCS production;
    7826: LH2 15 cm, 2.5 uA, PS5=1, DVCS production;
    7827: LH2 15 cm, 2.5 uA, PS5=1, DVCS production;
    7828: LH2 15 cm, 2.5 uA, PS5=1, DVCS production;
    7829: LH2 15 cm, 2.5 uA, PS5=1, DVCS production;
    7830: LH2 15 cm, 2.5 uA, PS5=1, DVCS production;
    7831: LH2 15 cm, 2.5 uA, PS5=1, DVCS production;
    7832: LH2 15 cm, 2.5 uA, PS5=1, DVCS production.