• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT
    Make New Entry, Make Followup Entry

    User name Hisham

    Log entry time 08:09:47 on October26,2010

    Entry number 336793

    keyword=Owl shift summary

    Crew:
    Hisham Albataineh
    Shloka Chandavar
    David Flay

    Timeline:

    00:00 Continued taking elastic data for the setting 2c: p0=1.981 GeV, theta=40 deg.
    00:40 Beam is back, beam was down at the beginig of the shift due to power supply problems.
    00:41 Requested escorted access to go down the hall to move the LHRS.
    01:10 LHRS moved to theta = 37.86 deg, p0 = 2.131 GeV.
    02:00 We had problem cycling the quadrupole currents.
    04:20 LHRS moved to 36.3 deg, p0 = 2.245 GeV.
    07:00 The beam went down for ~25 minutes

    Run list

    7889: Elastic calibration 2b setting: LH2, p0-2.131 GeV,theta = 37.86: Config. TrigDVCS
    7890: Elastic calibration 2b setting: LH2, p0-2.131 GeV,theta = 37.86: Config. TrigDVCS

    7891: Elastic calibration 2a setting: LH2, p0-2.245 GeV,theta = 36.30 deg: Config. TrigDVCS: junk
    7892: Elastic calibration 2a setting: LH2, p0-2.245 GeV,theta = 36.30 deg: Config. TrigDVCS
    7893: Elastic calibration 2a setting: LH2, p0-2.245 GeV,theta = 36.30 deg: Config. TrigDVCS
    7894: Elastic calibration 2a setting: LH2, p0-2.245 GeV,theta = 36.30 deg: Config. TrigDVCS: junk (beam went down at the begining of the run lasted till we end it)
    7895: Elastic calibration 2a setting: LH2, p0-2.245 GeV,theta = 36.30 deg: Config. TrigDVCS