Crew:
Hisham Albataineh
Shloka Chandavar
David Flay
Timeline:
00:00 Continued taking elastic data for the setting 2c: p0=1.981 GeV, theta=40 deg.
00:40 Beam is back, beam was down at the beginig of the shift due to power supply problems.
00:41 Requested escorted access to go down the hall to move the LHRS.
01:10 LHRS moved to theta = 37.86 deg, p0 = 2.131 GeV.
02:00 We had problem cycling the quadrupole currents.
04:20 LHRS moved to 36.3 deg, p0 = 2.245 GeV.
07:00 The beam went down for ~25 minutes
Run list
7889: Elastic calibration 2b setting: LH2, p0-2.131 GeV,theta = 37.86: Config. TrigDVCS
7890: Elastic calibration 2b setting: LH2, p0-2.131 GeV,theta = 37.86: Config. TrigDVCS
7891: Elastic calibration 2a setting: LH2, p0-2.245 GeV,theta = 36.30 deg: Config. TrigDVCS: junk
7892: Elastic calibration 2a setting: LH2, p0-2.245 GeV,theta = 36.30 deg: Config. TrigDVCS
7893: Elastic calibration 2a setting: LH2, p0-2.245 GeV,theta = 36.30 deg: Config. TrigDVCS
7894: Elastic calibration 2a setting: LH2, p0-2.245 GeV,theta = 36.30 deg: Config. TrigDVCS: junk (beam went down at the begining of the run lasted till we end it)
7895: Elastic calibration 2a setting: LH2, p0-2.245 GeV,theta = 36.30 deg: Config. TrigDVCS