• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT
    Make New Entry, Make Followup Entry

    User name efuchey

    Log entry time 23:59:58 on October28,2010

    Entry number 337248

    Followups:

    keyword=10/28/10 Swing shift summary

    Shift Crew:
    SL: Eric FUCHEY;
    TO: John LEROSE;
    3rd: Florian ITARD.


    4:00 pm: Hall in Controlled access;
    4:30 pm: Hall status switched to beam permit;
    4:40 pm: Starting beam recovery procedure;
    5:05 pm: Starting data taking;
    6:30 pm: Attempted to do a Vertical cavity scan;
    6:40 pm: Starting dead time study;
    8:10 pm: Restarting production; Also starting Compton production;

    DVCS Production and Compton production has not been interrupted till midnight, and will be continued this night.


    Run List:

    8003: LH2 15cm, 2uA, PS1 = 10, PS3 = 1, PS4 = 1;
    8004: LH2 15cm, 2uA, PS1 = 10, PS3 = 1, PS4 = 1;
    8005: LH2 15cm, 2uA, PS1 = 10, PS3 = 1, PS4 = 1;
    8006: LH2 15cm, 2uA, PS1 = 20, PS2 = 20, PS3 = 1, PS4 = 1, PS5 = 1;
    8007: Junk (dead time study, aborted because of beam);
    8008: LH2 15cm, 1uA, PS5 = 1, dead time study;
    8009: Junk (dead time study, aborted because of beam);
    8010: LH2 15cm, 2uA, PS5 = 1, dead time study;
    8011: Junk (dead time study, aborted because of beam);
    8012: LH2 15cm, 3uA, PS5 = 1, dead time study;
    8013: LH2 15cm, 4.5uA, PS5 = 1, dead time study;
    8014: LH2 15cm, 2uA, PS5 = 1, production;
    8015: LH2 15cm, 2uA, PS5 = 1, production;
    8016: LH2 15cm, 2uA, PS5 = 1, production;
    8017: LH2 15cm, 2uA, PS5 = 1, production;


    Compton Production:
    23569;
    23570;
    23571;
    23572;
    23573;
    23574;
    23575;