• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT
    Make New Entry, Make Followup Entry

    User name Ramesh

    Log entry time 23:53:13 on October30,2010

    Entry number 337696

    keyword=Shift Summary

    16:00 Took over day shift with harp scan underway.

    16:15 Harp scan finished, numbers look fine (sigma of 1H04A = (x, y) = (124 um, 117 um), and that for 1H04B = (118 um, 120 um)). Changed the target from empty to LH2. Target in position, asked for 2 uA beam

    16:25 Got 2 uA beam, started a LH2 production run 8133.

    21:35 Bob said he fixed the discrepancy between the number of coda events and the number of events reported in the end of run information. But still there is a little discrepancy (e.g., for run 8140 the coda events are 205 k but the T5 events are 193k, these two numbers are not similar).


    Run List:


    Run Type events comments
    8133 Elastic LH2 212k end of run has 242k events
    8134 Elastic LH2 188k end of run has 215k events 8135 Elastic LH2 228k
    8136 Elastic LH2 248k end of run has 281k events 8137 Elastic LH2 176k end of run has 196k events
    8138 Elastic LH2 150k end of run has 141.7k events
    8140 Elastic LH2 205k end of run has 193k events
    8142 test run (Julie)
    8143 test run (Alex)
    8144 test run (Alex) last run of the shift.