• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT
    Make New Entry, Make Followup Entry

    User name LeRose

    Log entry time 00:06:22 on November 05, 2010

    Entry number 338538

    keyword=Shift Summary (swing)

    Swing shift 11/2/2010
    John LeRose (SL)
    Tanja Horn (TO)
    Albert Shahinyan (3rd)
    
    In Restricted access at shift start
    Plan is to take data (kin 3) when we get beam back
    Left HRS 31.819 degrees 1.494 GeV/c
    Calorimeter 14.78 degrees
    
    19:06 Called for a sweep of the Hall. 
    	Sometime after 20:00 in controlled access
    	Alex and Carlos still testing DAQ at 20:23
    21:30 Beam back doing beam checks
    	Harp scans look good A sigma_x= 0.1594 y=0.1136
    						 B			0.1524	 0.1698
    22:00 Moving to LH2 target 
    	(turn fan speed on loop 2 back up to 46 Hz)
    
    run		start	comment
    8334	22:11	Production LH2, Calorimeter HV OFF
    8335	22:28	Production LH2, Calorimeter HV ON 
    				trig 5:168268, BCM u3:0.00671, BCM d3:0.007057, time:26.106 mins,
    BCMx3:4.3944 uA, DEAD TIME:-4.15%
    8336	23:02	Deadtime test,	Calorimeter HV OFF (12 micro Amps, raster ON)
    8337	23:18	Production LH2, Calorimeter HV ON (~3 micro Amps, raster OFF)
    ended because beam off
    				trig 5:156289, BCM u3:0.00601, BCM d3:0.006287,TIME:29.135 mins,
    BCMx3:3.5171 uA, DEAD TIME:-6.17%
    8338	23:57	Production LH2, Calorimeter HV ON (~3 micro Amps, raster OFF)