Log entry time 00:06:22 on November 05, 2010
Entry number 338538
keyword=Shift Summary (swing)
Swing shift 11/2/2010
John LeRose (SL)
Tanja Horn (TO)
Albert Shahinyan (3rd)
In Restricted access at shift start
Plan is to take data (kin 3) when we get beam back
Left HRS 31.819 degrees 1.494 GeV/c
Calorimeter 14.78 degrees
19:06 Called for a sweep of the Hall.
Sometime after 20:00 in controlled access
Alex and Carlos still testing DAQ at 20:23
21:30 Beam back doing beam checks
Harp scans look good A sigma_x= 0.1594 y=0.1136
B 0.1524 0.1698
22:00 Moving to LH2 target
(turn fan speed on loop 2 back up to 46 Hz)
run start comment
8334 22:11 Production LH2, Calorimeter HV OFF
8335 22:28 Production LH2, Calorimeter HV ON
trig 5:168268, BCM u3:0.00671, BCM d3:0.007057, time:26.106 mins,
BCMx3:4.3944 uA, DEAD TIME:-4.15%
8336 23:02 Deadtime test, Calorimeter HV OFF (12 micro Amps, raster ON)
8337 23:18 Production LH2, Calorimeter HV ON (~3 micro Amps, raster OFF)
ended because beam off
trig 5:156289, BCM u3:0.00601, BCM d3:0.006287,TIME:29.135 mins,
BCMx3:3.5171 uA, DEAD TIME:-6.17%
8338 23:57 Production LH2, Calorimeter HV ON (~3 micro Amps, raster OFF)