NEXT
Make New Entry,
Make Followup Entry
User name hyde
Log entry time 15:57:48 on November 05, 2010
Entry number 338674
keyword=Day Shift Summary
November 5, 2010, Day Shift Summary
Crew:
C. Hyde (SL)
R. Michaels (TO)
P. Nadel-Turonski (3rd)
Summary:
Hall C Target cooldown Hall A target boil-off
BCM Calibration Proceedure 3
http://opsntsrv.acc.jlab.org/ops_docs/online_document_files/MCC_online_files/HallA_BCM_linearity.pdf
DVCS kine 3-low
CODA config for production TrigDVCSBuff
Timeline:
- 08:00 Hall C Target Cooldown in progress. Turn off beam and move
cryotarget out
- 08:00 Compton HV off
- 08:24 Start Run 8345 Optics Target ps5=1 coda config LeftHRS
- 08:30 Compton HV on Start Compton run 23818
- 09:00 Move to empty target for BCM calibration
- 09:08 Start BCM logging (run 163)
- 09:40 Move to 6msr collimator 0.6199
- 09:50 Start BCM Calibration #1 coda file 8348, bcm logging 164
- 10:05 Start BCM Calibration #2 coda file 8349, bcm logging 165
- 10:35 End BCM Calibration move target to optics
- 10:40 optics run 8350
- 10:35 End run 8350, beam off to check LH2 target heating.
- 11:15 A. Camsonne working on Compton DAQ
- 13:05 Asked MCC for Controlled Access. They pointed out the Target
Beamline valves 1H04B and C closed
target return temp is 53 and rising.
- 14:00 JP Chen in hall to reset target vacuum gauges. possibly
instabilities in Hall C target and/or ESR caused temp spike on cold
return.
- 15:00 D. Abbott checking deadtime
- 15:55 Controlled access continues for Target work
Run list:
- Run 8345: start 08:30, 75K , 30 Hz electrons 10 Hz clock
- Run 8348: start 09:50,, BCM Calibration Proceedure 1, 10 Hz clock
- Run 8349: start 10:04 , BCM Calibration Proceedure 2, 10 Hz clock
- Run 8350: start 10:40 , 42K optics target LeftHRS BCM Colimator in
User name hyde
Log entry time 15:57:48 on November 05, 2010
Entry number 338675
keyword=Day Shift Summary
November 5, 2010, Day Shift Summary
Crew:
C. Hyde (SL)
R. Michaels (TO)
P. Nadel-Turonski (3rd)
Summary:
Hall C Target cooldown Hall A target boil-off
BCM Calibration Proceedure 3
http://opsntsrv.acc.jlab.org/ops_docs/online_document_files/MCC_online_files/HallA_BCM_linearity.pdf
DVCS kine 3-low
CODA config for production TrigDVCSBuff
Timeline:
- 08:00 Hall C Target Cooldown in progress. Turn off beam and move
cryotarget out
- 08:00 Compton HV off
- 08:24 Start Run 8345 Optics Target ps5=1 coda config LeftHRS
- 08:30 Compton HV on Start Compton run 23818
- 09:00 Move to empty target for BCM calibration
- 09:08 Start BCM logging (run 163)
- 09:40 Move to 6msr collimator 0.6199
- 09:50 Start BCM Calibration #1 coda file 8348, bcm logging 164
- 10:05 Start BCM Calibration #2 coda file 8349, bcm logging 165
- 10:35 End BCM Calibration move target to optics
- 10:40 optics run 8350
- 10:35 End run 8350, beam off to check LH2 target heating.
- 11:15 A. Camsonne working on Compton DAQ
- 13:05 Asked MCC for Controlled Access. They pointed out the Target
Beamline valves 1H04B and C closed
target return temp is 53 and rising.
- 14:00 JP Chen in hall to reset target vacuum gauges. possibly
instabilities in Hall C target and/or ESR caused temp spike on cold
return.
- 15:00 D. Abbott checking deadtime
- 15:55 Controlled access continues for Target work
Run list:
- Run 8345: start 08:30, 75K , 30 Hz electrons 10 Hz clock
- Run 8348: start 09:50,, BCM Calibration Proceedure 1, 10 Hz clock
- Run 8349: start 10:04 , BCM Calibration Proceedure 2, 10 Hz clock
- Run 8350: start 10:40 , 42K optics target LeftHRS BCM Colimator in