Main INDEX
Monthly INDEX
PREV
NEXT
Make New Entry,
Make Followup Entry
User name Ole Hansen
Log entry time 08:01:48 on November 07, 2010
Entry number 338939
keyword=Owl Shift Summary
November 7, 2010, Owl Shift Summary
Crew:
Ole Hansen (SL)
Florian Itard (TO)
Hyekoo Kang (3rd)
Summary:
DVCS kine 2 low energy production on LD2 target.
Eerily quiet data taking all night long.
One brief interruption due to a CODA crash.
Beam lost for about 30 minutes toward the end of the shift.
Timeline:
- 00:00 EDT: Start shift with production in progress, run #8432
- 01:45 EST: CODA crash and end of run 8434.
- 06:48-06:52 Beam off for QE measurement
- 07:18-07:52 No beam. "IOC issue".
- 08:00 Production resumed afetr beam down, run #8441
Run list:
Run Events BCM U3 D3 (C) Time Avg Curr Deadtime
8432 901 k 0.01082 0.01087 59.5 mins 3.0351 uA 24.09%
8433 968 k 0.01165 0.01169 60.1 mins 3.2357 uA 23.72%
8434 746 k 0.01071 0.01081 55.3 mins 3.2415 uA 48.17%
8435 831 k 0.01146 0.01153 59.8 mins 3.2064 uA 41.87%
8436 926 k 0.01176 0.01179 60.2 mins 3.2609 uA 30.48%
8437 891 k 0.01175 0.01189 59.9 mins 3.2878 uA 35.92%
8438 906 k 0.01170 0.01183 60.3 mins 3.2525 uA 33.11%
8439 786 k 0.01025 0.01028 59.5 mins 2.8736 uA 35.05%
8440 437 k 0.00463 0.00466 58.9 mins 1.3137 uA 13.18%