Main INDEX
Monthly INDEX
PREV
NEXT
Make New Entry,
Make Followup Entry
User name efuchey
Log entry time 08:00:42 on November 8,2010
Entry number 339097
keyword=Shift summary for 11-08 owl
Shift crew:
SL: Eric FUCHEY;
TO: Hoyoung KANG;
3rd: Hyekoo KANG.
12:00 am: continue DVCS production, compton data taking has been stopped (wild rates);
1:30 am: beam trip which last almost 25 minutes;
4:55 am: issue with daq, some nboards were not initialized; redownload the config solved the problem;
Other than these minor incidents everything goes well till 8:00 am.
Runlist:
8469: LH2 15 cm, 3 uA, PS5 = 1, DVCS production;
8470: LH2 15 cm, 3 uA, PS5 = 1, DVCS production;
8471: LH2 15 cm, 3 uA, PS5 = 1, DVCS production;
8472: LH2 15 cm, 0 uA, PS5 = 1, Pedestal run (almost 25 minutes beam trip);
8473: LH2 15 cm, 3 uA, PS5 = 1, DVCS production;
8474: LH2 15 cm, 3 uA, PS5 = 1, DVCS production;
8475: LH2 15 cm, 3 uA, PS5 = 1, DVCS production;
8476: LH2 15 cm, 3 uA, PS5 = 1, DVCS production;
8477: LH2 15 cm, 3 uA, PS5 = 1, DVCS production;
8478: LH2 15 cm, 3 uA, PS5 = 1, DVCS production.