Main INDEX
Monthly INDEX
PREV
NEXT
Make New Entry,
Make Followup Entry
User name A. Deur
Log entry time 16:09:05 on November18,2010
Entry number 340674
keyword=Day Shift summary
8:00 Shift started with run 8857 ongoing
8:15: stop run 8857: 218 k 0.00710 0.00779 57.8 mins 2.1458 uA 5.05%
8:16 short test run 8858 with various pulser rates
8:19 start run 8859 Deadtime test run with 183 pulser rate
8:40 Beam study starting. Stopped Compton run 24085. Turned off Compton HV.
Stopped test run 8859. 241K "events"
Rampting down HRS-L magnets.
Target moved to empty position.
Requested access to the Hall.
HRS-L polarity is being changed.
6msr collimator was put in
Moller was filled
We dropped from controlled access to restricted access. Apparently, a run safe box button was pushed, although nobody did it. Jack is investigating. We will need a sweep to go back to beam permit.
3:08 MCC called. They are ready to send the beam. Jack is still in the hall.