Main INDEX
Monthly INDEX
PREV
NEXT
Make New Entry,
Make Followup Entry
User name Jin Huang
Log entry time 07:56:48 on November 19, 2010
Entry number 340769
keyword=Shift Summary : Nov 19 Owl
Crew
- SL: Jin Huang for
Vincent Sulkosky
- TO: Robert Michaels
- Analysis: florian itard
- Expert: Alexandre Camsonne
Time Line
- 0000 Shift started. Status:
Full production : Run
E beam = 4.456GeV, 3uA; BPM A&B = (0,0)mm
HRSL: 65.552 degree, 1.864GeV
LH2 target, cryo status stable
- 0100 Move to LD2 target, start run 8884
- 0120 Compton HV trip. Turn back on, Restart
Compton run.
- 0409 MCC Injector problem. Beam off. Mean while,
take cosmic run 8888
- 0427 Beam back, continue production with run
8889
- 0540 Run 8890 was taken by Alex on DVCS daq2. It
was a test run for faster DAQ. Data should be good, although both start
run log and end of run log is missing
- 0720 Target temperature begin to rise due to
reduced cryo supply and Hall C target problem.
Run List
Run Events BCM
U3 D3 (C)
Time Avg
Curr Deadtime
8883 617 k 0.01012 0.01119 61.6
mins 2.8828 uA
14.44% <- LH2
8884 950 k 0.00876
0.00963 52.4 mins 2.9263
uA
28.62%
<- LD2 since this run
8885 1216 k 0.01118 0.01238 66.3
mins 2.9595 uA 27.97%
8886 924 k 0.00847 0.00935 53.0
mins 2.8026 uA 26.77%
8887 69 k 0.00056
0.00062 9.8 mins 1.0056
uA
32.47%
<- Stopped due to injector work
8889 974 k 0.00887
0.00984 60.3 mins 2.5860
uA 26.95%
8890 Test run by Alex
8891 Good 1hour production run. End of run log is missing so far