November 17, 2010, Day Shift Summary
Crew:
C. Hyde (SL)
P. Markowitz (TO)
(3rd)
Summary:
Target Cryogen problems due to Hall C target incident.
Work on Moeller power supply
Timeline:
- 08:00 Target heaters have been off for about 1 hour
- 08:17 Turned off beam to stabilize target
- 08:17 Reduced fan speed on loop 2. Loop 1 does not respond
- 08:42 ESR delivery all flow to Hall C target
- 09:00 Controlled access for Moller and Target work
- 09:12 Target fans turned off manually
- Starting cooling
- 09:50 Turning heaters on in hall
- 12:00 Moller work done. Ready for beam
- 12:30 Harp scan BPMA sig_x=0.12 sig_y=0.19 mm
- 12:40 Compton Run 24099
- 12:45 Start production run 8896 on LD2
- 13:45 Start efficiency run 8897 on LD2 LeftHRS
- 14:00 Move to Optics Target
- 14:08 Start Run 8898 Optics Target
- 14:20 false concern over rates. Start 8899 at 0.6muA, increase to 3muA
- 15:00 Move to LD2 Target
- 15:00 Move to LD2 Target
- 15:25 Start run 8900 LD2 Target
Run List:
- 8896 LD2 826K
- 8897 LD2 870K Efficiency LeftHRS
- 8898 Optics target LeftHRS
- 8899 Optics Target 275K LeftHRS