• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT
    Make New Entry, Make Followup Entry

    User name S. Sirca

    Log entry time 00:00:32 on November20,2010

    Entry number 340873

    keyword=Swing shift SUMMARY


    SWING shift summary // S. Sirca (SL), V. Mamyan (TO), M. Mihovilovic (3rd)
    ===========================================================================

    Events
    ===========================================================================
    16:00 Take over from day shift, continue production running on LD2
    with HRSL at 26.55 deg, 1.864 GeV/c,

    DVCS runs
    ===========================================================================
    Run Events BCM U3 D3 (C) Time Avg Curr Deadtime
    8900 1221 k 0.01130 0.01246 61.8 mins 3.2014 uA 30.15%
    8902 1181 k 0.01090 0.01207 60.4 mins 3.1679 uA 29.02%
    8901 1273 k 0.01177 0.01296 66.0 mins 3.1240 uA 28.30%
    8903 1119 k 0.01034 0.01137 59.4 mins 3.0465 uA 26.27%
    8904 1123 k 0.01040 0.01148 58.6 mins 3.1114 uA 28.77%
    8905 1085 k 0.00998 0.01104 58.4 mins 2.9974 uA 28.42%
    8906 1204 k 0.01115 0.01225 61.9 mins 3.1529 uA 29.57%
    8907 *** EOR not yet in HALOG
    8908 *** per J. Roche's request, this is a 1/2 hour run with 1.5 uA beam

    Compton runs
    ===========================================================================
    24104 started at 15:45
    24105 16:24
    24106 17:34
    24107 18:18
    24108 19:29
    24109 20:02
    24110 20:35
    24111 21:08
    24112 21:44
    24113 22:20
    24114 22:53
    24115 23:28



    FIGURE 1