NEXT
Make New Entry,
Make Followup Entry
User name S. Sirca
Log entry time 00:20:49 on November23,2010
Entry number 341341
keyword=Swing shift SUMMARY
SWING shift summary // S. Sirca (SL/3rd), A. Tobias (TO/3rd)
====================================================================
Events
====================================================================
16:00 Take over from day shift with no beam
18:00 Resume beam delivery to Hall A
18:05 Center BPMs, looks ok
18:15 Harp scans look ok (ELOG 1554446)
18:34 Resume LH2 production with HRSL at 36.56 deg, 1.136 GeV/c
DVCS runs
====================================================================
Run Events BCM U3 D3 (C) Time Avg Curr Deadtime
8964 318 k 0.01054 0.01163 61.1 mins 3.0226 uA 7.80%
8965 19 k 0.00062 0.00068 3.9 mins 2.7786 uA 9.22%
8966 318 k 0.01059 0.01166 63.1 mins 2.9372 uA 6.93%
8967 297 k 0.00991 0.01096 60.1 mins 2.8952 uA 6.43%
8968 *** no EOR in HALOG ***
8969 1310 k 0.00940 0.01040 60.1 mins 2.7438 uA 78.03%
8970 *** no EOR in HALOG ***
Compton runs
====================================================================
24191 started at 18:34 ?.??M events
24192 18:42 2.33M
24193 19:42 1.67M
24194 19:54 1.78M
24195 20:25 1.78M
24196 20:57 1.79M
24197 21:29 1.92M
24198 22:03 1.80M
24199 22:35 1.80M
24200 23:07 1.90M
24201 23:42 2.50M