Crew:
J. Roche (SL)
F. Itard (TO/3rd)
Highlights:
Production on DVCS kine 1-low, hydrogen target.
Two LHRS magnet trips on low Helium faults at the beginning of the shift.
Timeline:
Run Events BCM U3 D3 (C) Time Avg Curr Deadtime 9020 300 k 0.01001 0.01105 60.1 mins 2.9206 uA 6.36% 9021 301 k 0.01006 0.01106 60.1 mins 2.9290 uA 6.44% 9022 127 k 0.00429 0.00474 26.0 mins 2.8990 uA 6.07% 9023 2316 k 0.00985 0.01086 58.5 mins 2.9502 uA 86.65% -----????? 9024 260 k 0.00823 0.00904 60.7 mins 2.3722 uA 6.34% 9025 294 k 0.00976 0.01080 59.2 mins 2.8938 uA 6.17% 9026 313 k 0.01045 0.01154 62.3 mins 2.9426 uA 6.32% 9028 282 k 0.00923 0.01017 60.3 mins 2.6807 uA 6.47%Compton Run list: