    User name efuchey

    Log entry time 16:07:33 on November27,2010

    Entry number 341684

    keyword=11-27-day shift summary

    Shift crew:
    SL/TO: Eric FUCHEY;
    3rd: Carlos MUNOZ CAMACHO.

    8:00 am: continue production;
    8:40 am: ROC 17 rebooted since it was not responding;
    9:35 am: Beam down: MCC experienced an IOC problem;
    10:50 am: MCC able to deliver beam again; switching target to empty for beam recovery procedure;
    11:25 am: MCC experienced again the problem;
    1:25 pm: MCC finally sloved the problem, beam recovery procedure done (again); going back to production;
    1:55 pm: accelerator shut down again;
    4:05 pm: CHL problem: Down again for some time...

    DVCS runlist:

    9029: 3uA, LH2 15 cm, PS5 = 1, production;
    9030, 9031: Junk;
    9032: 3uA, LH2 15 cm, PS5 = 1, production;
    9033: No beam, pedestal run;
    9034: 3uA, LH2 15 cm, PS5 = 1, production;


    End-of-run info:
    Run Events BCM U3 D3 (C) Time Avg Curr Deadtime
    9029 305 k 0.01017 0.01126 60.4 mins 2.9571 uA 6.57%
    9032 243 k 0.00790 0.00869 52.7 mins 2.6250 uA 6.47%


    Compton runlist (production, 1750V):
    24274;
    24275;
    24276;
    24278;