Log entry time 16:07:33 on November27,2010
Entry number 341684
keyword=11-27-day shift summary
Shift crew:
SL/TO: Eric FUCHEY;
3rd: Carlos MUNOZ CAMACHO.
8:00 am: continue production;
8:40 am: ROC 17 rebooted since it was not responding;
9:35 am: Beam down: MCC experienced an IOC problem;
10:50 am: MCC able to deliver beam again; switching target to empty for beam recovery procedure;
11:25 am: MCC experienced again the problem;
1:25 pm: MCC finally sloved the problem, beam recovery procedure done (again); going back to production;
1:55 pm: accelerator shut down again;
4:05 pm: CHL problem: Down again for some time...
DVCS runlist:
9029: 3uA, LH2 15 cm, PS5 = 1, production;
9030, 9031: Junk;
9032: 3uA, LH2 15 cm, PS5 = 1, production;
9033: No beam, pedestal run;
9034: 3uA, LH2 15 cm, PS5 = 1, production;
End-of-run info:
Run Events BCM U3 D3 (C) Time Avg Curr Deadtime
9029 305 k 0.01017 0.01126 60.4 mins 2.9571 uA 6.57%
9032 243 k 0.00790 0.00869 52.7 mins 2.6250 uA 6.47%
Compton runlist (production, 1750V):
24274;
24275;
24276;
24278;