User name jroche
Log entry time 00:16:58 on November 28, 2010
Entry number 341728
keyword=Swing shift summary
November 28, 2010, Swing shift summary
Crew:
J. Roche (SL/TO)
V. Punjabi (3rd)
Highlights:
Very quiet production on DVCS kine 1-low, hydrogen target.
Half wave plate is now :IN
Timeline:
- 16:15: started shift with no beam due to CHL issues
- 16:20: Hall C request half wave plate IN.
- 16:30: Harp scan, widths are good after correction.
- 16:45: moved to LH2 15 cm, starts run 9035
- 17:48: Compton HV=1750V and Y photon detector position=43
mm. Rates are good: with cavity on: 1600 Hz/uA and with cavity
off:400 Hz/uA. Run 24279 and 24280 are junk: used for setup.
- 18:38: Vina see that CODA seems stuck. This happens during run
9036 after 197 k events. She typed "startcoda", choose TrigDVCSNoC
configuration and we are back in buisness.
- 23:45: changed epics calibration for the downstream
bcm. Interrupted run 9042 to do so.
Run list:
Run Events BCM U3 D3 (C) Time Avg Curr Deadtime
9035 296 k 0.00982 0.01080 61.5 mins 2.7922 uA 6.54%
9036 end of run missing because of coda crash
9037 299 k 0.00998 0.01100 60.3 mins 2.8997 uA 6.28%
9038 303 k 0.01028 0.01130 58.5 mins 3.0734 uA 6.49%
9039 297 k 0.00993 0.01099 58.9 mins 2.9620 uA 6.58%
9040 306 k 0.01031 0.01137 60.1 mins 3.0076 uA 6.70%
9041 302 k 0.01013 0.01113 60.4 mins 2.9323 uA 6.19%
9042 16 k 0.00053 0.00058 3.1 mins 2.9702 uA 9.12%
Compton Run list:
24281, 24282, 24283, 24285, 24286, 24287, 24288, 24289