Crew:
J. Roche (SL/TO)
B. Waidyawansa (3rd)
Highlights:
Beam conditions getting worse starting around 10am: lost of trips and
Compton rates wondering a bit.
Production on Kin I-low still going on
Timeline:
- 10:15: Noticed that the Compton rates are
degrading, MCC reports
that the energy of the machine is pretty unstable and that they are
running the program Krest to try to solve it. The hope is that once
the machine is stable again, the rates will quiet down.
- 12:40: Lowered by the Compton HV to 1675V before the Compton run 24311
- 12:30: MCC takes the beam away to adress the beam tripping
problems.
- 13:00: beam is back
- Compton HV back at 1750V in the middle of run 24312.
- 15:00 and after: MCC is still chasing after the source of
energy instabilities, tries to setup the feedback on Hall A , reverts
this after a few minutes.
- leaving shift with run 9059 on going.
Run list:
Run Events BCM U3 D3 (C) Time Avg Curr Deadtime
9052 342 k 0.01147 0.01261 67.5 mins 2.9728 uA 6.35%
9053 306 k 0.01028 0.01136 60.7 mins 2.9739 uA 6.17%
9054 292 k 0.00957 0.01055 62.8 mins 2.6679 uA 6.37%
9055 end of run failed so no end of run halog entry
9056 221 k 0.00700 0.00772 51.7 mins 2.3714 uA 6.23%
9057 271 k 0.00860 0.00947 63.0 mins 2.3899 uA 6.02%
9058 218 k 0.00590 0.00648 68.9 mins 1.4971 uA 5.94%
Compton Run list:
24305, 24306, 24307,24308,24309, 24310, 24316