Log entry time 07:55:53 on November30,2010
Entry number 342040
keyword=Shift Summary
3.20am Beam recovery completed
BPM A X =-.09mm Y =0.152mm
BPM B X = 0.00mm Y =0.05mm
Harp scan (entry 1555376)
04A
sigma X = 0.113mm
sigma Y = 0.157mm
04B
sigma X = 0.188mm
sigma Y = 0.152mm
3.30am
Target LH2
3uA
Production run started 9103.
Last good run 9105
Halted the production data taking due to the beam not available, the reason according to the MCC was some issues with IOCs. They believe this is a software issue. Software experts are working on this. We will not get the beam before 8am.