User name A. Deur
Log entry time 16:01:03 on November30,2010
Entry number 342083
keyword=Day shift summary
8:00 Hall in controlled access (beam studies + pass change)
12:30 Changed LHRS setting to kinematics 21.5 degrees and P0=2.591 GeV. Q2 and Q3 were cycled.
13:25 Hall is in power permit.
13:50 Tune beam in the Hall
13:57 Beam up and down: tunning problems.
15:31 CW beam in the Hall. Y-position on BPM A is off (+1mm)
16:00 Still adjusting the y-BPM A position