Log entry time 23:59:55 on November30,2010
Entry number 342144
keyword=Swing shift summary
16:16 Beam to 10uA
16:50 Harp Scan is done.
16:56 Target to 15cm LH2 from empty
17:03 Start production run
18:06 EP Ion Chamber light up. MCC wants to turn off compton chicane. Waiting for end of run.
18:30 Target moved to optics
Compton chicane is off.
19:22 Target moved to LH2.
19:25 Beam current is 2uA.
20:13 Beam current is 3uA.
21:15 MCC turn off beam.
22:20 DVCS 2006 HV tripped.
23:22 Ask MCC to do bleedthrough test.
9118 17:03-17:47 LH2 878K production
9119 junk
9120 17:49-18:19 LH2 106k Left HRS trigger
9121 18:45-19:17 optics 150k optics
9122 junk
9123 19:26-20:10 LH2 476K prod with 2uA
9124 20:15-21:00 LH2 567K prod with 3uA and for all next runs
9125 21:01-21:15 166K
9126 21:36-22:23 684K
9127 22:27-23:21 715K
9128 23:28-