    User name hyao

    Log entry time 23:59:55 on November30,2010

    Entry number 342144

    keyword=Swing shift summary

    16:16 Beam to 10uA
    16:50 Harp Scan is done.
    16:56 Target to 15cm LH2 from empty
    17:03 Start production run
    18:06 EP Ion Chamber light up. MCC wants to turn off compton chicane. Waiting for end of run.
    18:30 Target moved to optics
    Compton chicane is off.
    19:22 Target moved to LH2.
    19:25 Beam current is 2uA.
    20:13 Beam current is 3uA.
    21:15 MCC turn off beam.
    22:20 DVCS 2006 HV tripped.
    23:22 Ask MCC to do bleedthrough test.

    9118 17:03-17:47 LH2 878K production
    9119 junk
    9120 17:49-18:19 LH2 106k Left HRS trigger
    9121 18:45-19:17 optics 150k optics
    9122 junk
    9123 19:26-20:10 LH2 476K prod with 2uA
    9124 20:15-21:00 LH2 567K prod with 3uA and for all next runs
    9125 21:01-21:15 166K
    9126 21:36-22:23 684K
    9127 22:27-23:21 715K
    9128 23:28-