Owl shift summary
12:00 Beam continuously on with 3.0 uA.
Production runs with Kinematic 3 on LH2.
No Compton runs.
2:19 Low down the current to 2.9 uA to lower the dead time
5:00 The beam start to trip often ( 3 times in 10 mins)
5:12 MCC called to take the beam off for Hall B setup
5:16 Beam back.
8:00 Run 9236 in process
Run list
9128 1002K production Kin-3 LH2.
9129 1018K production
9130 1036K production
9131 824K production
9132 1032K production
9133 566K production
9134 1016K production
9135 923K production