    User name n.muangma

    Log entry time 08:02:29 on December 1,2010

    Entry number 342188

    keyword=Owl shift summary

    Owl shift summary

    12:00 Beam continuously on with 3.0 uA.
    Production runs with Kinematic 3 on LH2.
    No Compton runs.
    2:19 Low down the current to 2.9 uA to lower the dead time
    5:00 The beam start to trip often ( 3 times in 10 mins)
    5:12 MCC called to take the beam off for Hall B setup
    5:16 Beam back.
    8:00 Run 9236 in process

    Run list
    9128 1002K production Kin-3 LH2.
    9129 1018K production
    9130 1036K production
    9131 824K production
    9132 1032K production
    9133 566K production
    9134 1016K production
    9135 923K production