• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT
    Make New Entry, Make Followup Entry

    User name A. Deur

    Log entry time 16:03:50 on December 2,2010

    Entry number 342436

    keyword=day shift summary

    8:09 Beam down for beam study. Stop current run 9163, 364k events.
    Moved target to empty position.
    8:15 Hall is in controlled access.
    2:25 MCC said they are done with their beam studies. We still have Alexandre and Ben in the hall.
    2:41 Alexandre called: they are exiting the hall. Before requesting beam permit, Alexandre will check that the DAQ behave properly.
    15:11 Request beam permit.
    3:40 Beam in the hall. Beam position look good. Requested harp scans.
    3:50 harp scan resulst: A 0.180*0.080 and B: 0.135*0.075. The y-width is below the specs (0.1) so we asked MCC to try to increase it.
    16:01 Sigmas now look good: A; 0.21*0.125 B: 0.167*0.135
    16:03 Asked target motion to be masked to move it in L2 15cm.