• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT
    Make New Entry, Make Followup Entry

    User name jpchen

    Log entry time 00:03:26 on December 3,2010

    Entry number 342483

    keyword=Swing shift summary

    Swing shift summary,

    Shift workers: J. P. Chen (SL), T. Horn (TO), R. Ent (3rd).

    16:00 beam recovering from down.
    Moved to LH2 target.
    Beam tuning.
    16:30 beam tuned through Compton Chicane.
    Checking Compton.
    16:50 Compton rate too high, asked MCC to tune.
    18:00 Compton rate is fine (<1KHZ). Asked to tune beam position to 0,0
    18:05 reduced to 2 uA (due to dead time). Started production.
    18:15 Coda problem. no end of run window.
    18:40 Compton rates fluctuate, still too high. will not run Compton tonight.
    After stopped Compton, Dead time improved. Back to 3 uA.
    22:05 efficiency run
    22:40 bleedthrough measurement.
    back to production.
    24:00 still production, run 9206 ongoing.

    Run information:
    Run Events BCM U3 D3 (C) Time Avg Curr Deadtime
    incomplete end-of-run entry for run 9196, skipping
    incomplete end-of-run entry for run 9197, skipping
    9198 422 k 0.00404 0.00406 23.1 mins 2.9220 uA 29.42%
    9200 575 k 0.00567 0.00570 42.4 mins 2.2356 uA 16.74%
    9201 1052 k 0.01056 0.01055 60.4 mins 2.9132 uA 16.02%
    9202 1068 k 0.01052 0.01054 60.3 mins 2.9080 uA 15.27%
    9199 5 k 0.00005 0.00005 0.4 mins 2.2565 uA 38.72%
    9203 1096 k 0.01032 0.01037 58.7 mins 2.9383 uA 19.45%
    9204 474 k 0.00429 0.00428 32.3 mins 2.2091 uA 13.76%
    9205 1085 k 0.01005 0.01008 56.3 mins 2.9796 uA 19.23%