• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT
    Make New Entry, Make Followup Entry

    User name horn

    Log entry time 16:03:10 on December 3,2010

    Entry number 342586

    keyword=Day shift summary


    DAY SHIFT 3 DECEMBER 2010

    SL: T. Horn, TO: R. Michaels

    SHORT SUMMARY
    Took production data with beam through compton chicane. At end of shift asked MCC to switch tune to straight through.


    DETAILED SUMMARY
    8:00 MCC still working on RF issues from earlier this morning
    8:20 Beam back. Resume data taking (KIN 3, p0=2.59 GeV/c, theta0=21.5 deg)
    9:45 BPMA beam positions drifting to about +0.35 in X and to about +0.25 in Y during run 9215, MCC resets energy lock/FB and adjusts beam positions. Beam positions on BPMA back to about zero in X and Y at end of run 9215
    10:20 Started run 9216 with BPMA positions of (+0.07,+0.04)
    12:30 Beam gone for Qweak tests in Hall C, taking a pedestal run (9218)
    12:50 Resume production data taking
    15:40 Changing tune from through beam through compton chicane to straight through
    15:55 Start run 9222 with straight running tune

    RUN SUMMARY
    Run Events BCM U3 D3 (C) Time Avg Curr Deadtime
    9214 1022 k 0.01032 0.01032 60.6 mins 2.8395 uA 16.25%
    9215 1211 k 0.00997 0.00998 59.7 mins 2.7853 uA 21.19%
    9216 1033 k 60 mins 2.8 (no end run)
    9217 1265 k 0.00935 0.00934 56.1 mins 2.7784 uA 23.18%
    9218 15 k 0.00002 0.00000 12.1 mins 0.0175 uA 4.70%
    9219 1290 k 0.00974 0.00975 59.8 mins 2.7147 uA 23.32%
    9220 1244 k 0.00944 0.00946 59.7 mins 2.6380 uA 29.52%
    9221 968 k 0.00724 0.00721 45.9 mins 2.6245 uA 25.12%