• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT
    Make New Entry, Make Followup Entry

    User name hyao

    Log entry time 00:00:55 on December 5,2010

    Entry number 342812

    keyword=Swing Shift Summary

    17:18 Finish deadtime run.
    18:27 Escorted access to change the angle of calorimeter and LHRS.
    18:41 Set LHRS P=2.962 GeV
    20:10 Work in Hall done. Back to Beam Permit.
    20:12 Start production with 1.6 uA.

    Run Events BCM U3 D3 (C) Time Avg Curr Deadtime
    9252 1343 k 0.01411 0.01419 59.7 mins 3.9502 uA 24.50%
    9253 955 k 0.00975 0.00974 59.4 mins 2.7328 uA 15.02%
    9257 1126 k 0.00579 0.00580 60.1 mins 1.6060 uA 21.50%
    9258 1057 k 0.00534 0.00532 59.3 mins 1.4986 uA 15.73%