• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT
    Make New Entry, Make Followup Entry

    User name M Friend

    Log entry time 07:58:21 on December 6,2010

    Entry number 343005

    keyword=Owl shift summary

    Starting shift with efficincy run 9285.

    12:25 - Back to production.

    05:44 - Loop 2 fan died. Called JP.

    06:00 - JP unable to fix the target remotely; called for a controlled access so he can take a look. JP unable to get the fan working from the hall. He has paged Dave Meekins.

    07:11 - DVCS ioc rebooted.

    Shift ending with hall in controlled access. Dave Meekins should be here soon to look at the broken fan.


    Run Events BCM U3 D3 (C) Time Avg Curr Deadtime
    9286 1075 k 0.00545 0.00542 60.7 mins 1.4907 uA 16.74%
    9287 1024 k 0.00515 0.00513 61.1 mins 1.4012 uA 14.87%
    9288 1048 k 0.00530 0.00531 59.1 mins 1.4960 uA 17.99%
    9289 1096 k 0.00554 0.00551 64.2 mins 1.4359 uA 16.04%
    9290 927 k 0.00468 0.00465 54.2 mins 1.4338 uA 16.76%
    9291 342 k 0.00177 0.00176 26.2 mins 1.1236 uA 13.97% - target loop 2 broke in the middle of this run


    Efficiency run:
    9285 506 k 0.00256 0.00256 29.5 mins 1.4489 uA 10.92%