08:04. MCC called: beam is taken away for beam studies. Stop run 9400 (285K events). Moved the target to empty position and decreased the loop2 fan frequency to 24 Hz.
08:25: We are in controlled access.
13:12 Hall back in beam permit.
14:41 MCC called: they are sending tune beam in the Hall.
14:46 MCC ready to send CW beam. Requested 5uA. Set back the fan frequency to 48Hz for loop 2.
14:51. Acceptable beam with BPM reading in specs. Requested a harp scan.
Harp scan showed that beam is narrow for x (4b x=0.05). Asked for beam x-size to be increased.
15:23 Beam size acceptable. We move the target to loop 2 (15cm LH2)
15:29 Target in beam. Requested 1 uA.
15:30 Start run 9418 (NOT a production run. Alexandre C. is testing the new trigger)
15:37 Noticed that the beam position is off for BPM 4b (0.23). Called MCC and asked to zero it.
15:41 MCC called: they will close slightly our slit in order to get a better current regulation.
15:54 Start test run 9421 (previous runs were tests too)
15:59 Asked MCC to turn beam lock on (since Hall C is down, there is no conflict with their lock)