NEXT
Make New Entry,
Make Followup Entry
User name LeRose
Log entry time 00:01:47 on December 13, 2010
Entry number 344072
keyword=Shift Summary (swing)
Swing Shift Sunday December 12,2010
John LeRose (SL)
Huan Yao (TO)
Franco Garibaldi (3rd)
Controlled access at shift start
18:00 end of Controlled Access Going to power permit
18:35 Beam is back request 1 microAmp. Put in LD2 target
18:50 target is in and ready for beam. Alex is checking the DAQ.
19:55 go to 1.5 microAmps
21:03 go to 1 microAmp
21:27 beam off 10-15 minutes by MCC estimate
21:54 beam back
23:30 had to reboot DVCS IOC
23:56 brief interuption of beam for BSY setup
time run # comment
18:56 Run 9562 Production 1 microAmp
19:55 Run 9563 Production 1.5 microAmps
21:03 Run 9564 Production 1 microAmp stopped for no beam
21:55 Run 9565 Production 1 microAmp
22:54 Run 9566 Production 1 microAmp Stopped for DVCS IOC reboot
23:36 Rub 9567 Production 1 microAmp brief pause for setup of BSY dump
Run Events BCM U3 D3 (C) Time Avg Curr Deadtime
9562 1297 k 0.00361 0.00344 58.7 mins 0.9999 uA 22.51%
9563 2135 k 0.00606 0.00577 66.8 mins 1.4752 uA 36.34%
9564 448 k 0.00123 0.00118 23.7 mins 0.8484 uA 22.20%
9565 1359 k 0.00380 0.00360 58.6 mins 1.0533 uA 17.56%
9566 892 k 0.00251 0.00238 36.9 mins 1.1046 uA 27.43%
9567 still running at shift end