• Main INDEX
  • Monthly INDEX
  • PREV
  • NEXT
    Make New Entry, Make Followup Entry

    User name LeRose

    Log entry time 00:01:47 on December 13, 2010

    Entry number 344072

    keyword=Shift Summary (swing)

    Swing Shift Sunday December 12,2010
    John LeRose (SL)
    Huan Yao (TO)
    Franco Garibaldi (3rd)
    
    Controlled access at shift start
    18:00 end of Controlled Access Going to power permit
    18:35 Beam is back request 1 microAmp. Put in LD2 target
    18:50 target is in and ready for beam. Alex is checking the DAQ.
    19:55 go to 1.5 microAmps
    21:03 go to 1 microAmp
    21:27 beam off 10-15 minutes by MCC estimate
    21:54 beam back
    23:30 had to reboot DVCS IOC 
    23:56 brief interuption of beam for BSY setup
    
    time	run	#		comment
    18:56	Run	9562	Production 1 microAmp
    19:55	Run	9563	Production 1.5 microAmps
    21:03	Run 9564	Production 1 microAmp stopped for no beam
    21:55	Run	9565	Production 1 microAmp
    22:54	Run 9566	Production 1 microAmp Stopped for DVCS IOC reboot
    23:36	Rub 9567	Production 1 microAmp brief pause for setup of BSY dump
    
     Run    Events  BCM U3   D3 (C)    Time         Avg Curr      Deadtime
     9562  1297 k   0.00361  0.00344   58.7 mins    0.9999 uA    22.51%
     9563  2135 k   0.00606  0.00577   66.8 mins    1.4752 uA    36.34%
     9564   448 k   0.00123  0.00118   23.7 mins    0.8484 uA    22.20%
     9565  1359 k   0.00380  0.00360   58.6 mins    1.0533 uA    17.56%
     9566   892 k   0.00251  0.00238   36.9 mins    1.1046 uA    27.43%
     9567 still running at shift end