Main INDEX
Monthly INDEX
PREV
NEXT
Make New Entry,
Make Followup Entry
User name Holmstrom
Log entry time 16:00:14 on December13,2010
Entry number 344164
keyword=Day shift summary
Day shift summary:
Shift workers: T. Holmstrom (SL), J. P. Chen (TO), L. El Fassi (3rd)
8:00 Running on LH2 at 1.5 uA at kin 2_high
8:20 Found that LH2 fan was only 24 Hz, while LD2 was 60 Hz.
Stopped run 9579.
changed LH2 fan to 46 Hz and LD2 to 34 Hz. Adjusted J-T accordingly.
started run 9580.
11:00 DAQ crashed.
11:05 DAQ back up
11:35 Beam away to tune compton
12:20 Trying to bring Beam Back.
12:29 Beam back - BCM Study - Run 9585
12:50 Back to production.
16:00 Shift Ends with production.
Run Information
9580 1034 k 0.00521 0.00498 59.1 mins 1.4359 uA 12.55%
9581 1179 k 0.00598 0.00568 66.4 mins 1.4642 uA 16.74%
9582 49 k 0.00023 0.00022 5.3 mins 0.7127 uA 17.17%
9584 456 k 0.00231 0.00220 25.6 mins 1.4675 uA 16.64%
9585 374 k 0.00189 0.00179 22.7 mins 1.3512 uA 15.44%
9586 1057 k 0.00534 0.00510 60.6 mins 1.4349 uA 21.62%