Log entry time 16:47:12 on December14,2010
Entry number 344389
keyword=Day Shift Summary (Late Entry)
Shift Crew:
C. Munoz/J. Roche
X. Zheng
Summary Editor:
V. Sulkosky
Timeline:
08:00 Production data with 1.5 uA on LH2
08:30 Begin Beam studies
09:16 Hall A is now in controlled access
10:10 L-HRS moved to 37 degrees
10:30 L-HRS dipole polarity changed to postive
10:30 Calorimeter moved to 22.6 degrees and 5.5 meters
11:25 L-HRS magnets now positive polarity and set to 2.406 GeV/c;
Q2 and Q3 were cycled
11:40 Asked MCC to take us to beam permit
12:05 Beam studies are over
13:00 CW beam restored; begin beam recovery procedure
13:15 Target moved to loop 2 LH2 15 cm for elastic calibrations at
2.5 uA
15:06 Kinematic change to elastic calib 2; P0 = 2.607 GeV/c and
34.76 degrees
15:29 Begin elastic calibration 2
Run list:
Run Events BCM U3 D3 (C) Time Avg Curr Deadtime
----------------------------------------------------------------------
9615 1292 k 0.00650 0.00621 76.4 mins 1.3867 uA 15.85%
9637 88 k 0.00216 0.00206 15.2 mins 2.3132 uA 73.38%
9638 563 k 0.01290 0.01229 90.6 mins 2.3166 uA 5.56%
9639 34 k 0.00080 0.00077 5.4 mins 2.4194 uA 50.51%
9640 373 k 0.00939 0.00895 57.3 mins 2.6689 uA 5.88%
Runs 9616 through 9636 were DAQ tests runs by Alex.