Main INDEX
Monthly INDEX
PREV
NEXT
Make New Entry,
Make Followup Entry
User name Holmstrom
Log entry time 00:00:23 on December15,2010
Entry number 344444
keyword=Swing Shift Summary
16:00 Shift starts with beam on target taking elastic data.
17:23 Reboot Calorimeter IOC
17:25 Start shifting to elastic kinematic 3.
17:31 Start Elastic Kinematic 3
20:10 End Kinematic 3 ask for a sweep and access. Ramp Magnets
20:40 Moved spectrometer to 18.78 degrees.
21:37 Production on LD2 continued.
24: shift ends in Production
Run Information
9640 373 k 0.00939 0.00895 57.3 mins 2.6689 uA 5.88%
9641 304 k 0.00740 0.00705 49.0 mins 2.4563 uA 58.64%
9642 290 k 0.00676 0.00646 50.0 mins 2.2044 uA 61.91%
9643 263 k 0.00574 0.00545 48.1 mins 1.9387 uA 5.72%
9644 334 k 0.00777 0.00743 57.8 mins 2.1924 uA 5.63%
9645 235360 k 0.00004 0.00001 36.7 mins 0.0118 uA 99.65%
9648 3507 k 0.00540 0.00516 53.0 mins 1.6603 uA 76.70%
9650 1229 k 0.00188 0.00179 21.3 mins 1.4386 uA 79.25%