Main INDEX
Monthly INDEX
PREV
NEXT
Make New Entry,
Make Followup Entry
User name Holmstrom
Log entry time 16:07:46 on December17,2010
Entry number 344858
keyword=Day SHift Summary
8:00 Shift starts with beam on target.
9:50 Switch to D2 running.
12:00 Cryo flow to Hall C stops, which causes a rise in our temperatures. The target warms up and needs to be cooled. Beam off to fix problem. J. P. Chen helping us.
12:40 Moving to Optics target while the target recovers.
12:53 Loop 1 has recovered so we are moving back.
13:03 Return to production.
13:21 DVCS IOC crashed. Rebooted.
16:00 SHift Ends with beam on target
Runs
9730 4109 k 0.01247 0.01200 60.9 mins 3.3478 uA ~25%
9731 1732 k 0.00263 0.00251 15.7 mins 2.7263 uA
9732 6501 k 0.00979 0.00933 59.1 mins 2.6955 uA
9735 323 k 0.00049 0.00047 2.9 mins 2.7788 uA
9738 5731 k 0.00865 0.00830 52.4 mins 2.6949 uA
9739 441 k 0.00086 0.00082 12.2 mins 1.1431 uA
9740 2004 k 0.00306 0.00291 17.7 mins 2.8200 uA ~28%
9741 5499 k 0.00836 0.00801 60.3 mins 2.2630 uA
9742 6556 k 0.01008 0.00963 59.0 mins 2.7844 uA ~29%