    User name A. Camsonne

    Log entry time 11:31:36 on December 07, 2011

    Entry number 359616

    keyword=BPM cabling and test signal

    Pete Francis restored the cabling of the BPM when installing the SEE. So we should be all set for the BPM besides ajusting the attenuation factors and offsets.

    He turned a ramp on for testing on the receiver so we can test it.

    So we should be able to see that in spot++. Good way to check cabling. We will let the signal on today and tomorrow.