    User name zwzhao

    Log entry time 15:34:10 on December 16, 2011

    Entry number 360197

    keyword=day shift summary

    8:30 
    start to set the carbon inelastic run
    
    9:00 
    set L&R septa to 481A, Q1 859.78067A, Q2 702.7325, Q3 828.294. 
    MCC confirms both fast and slow raster are off. 
    
    MCC is adjesting HallC beam, we have no beam for about 1 hour.
    
    10:00 
    beam back, start LUMI test run. see the seperate entry for data
    
    13:50
    LUMI test finished.
    Try to adjuest HRS_R momentum from 1.56 to 1.72, D1 takes long time to
    change by regulation. Aiden has turn off D1 regulation, set the D1 by
    hand to approcah the desired value, then set on D1 regulation.
    
    14:30 
    have control access as planed